Projects

From production requirements to acceptance—every project phase builds on sound technical decisions.

[ ROBOTICS & AUTOMATION PROJECTS ]

Customized systems instead of interchangeable standard packages

Every project starts with the real process: parts, variants, cycle time (takt), quality, material flow, and interfaces. Only then do the choice of robots, grippers, fixtures, controls, and the safety concept come together.

AROBIS connects planning and implementation in a way that assumptions are checked early and results are confirmed in a way that remains traceable up to the production ramp-up.

[ PROJECT RESPONSIBILITY ]

Three levels that must work together

A good concept, a cleanly integrated system, and stable operation belong together.

01

Concept & Engineering

Feasibility, layout, reach, cycle time (takt), interfaces, and safety.

02

Build & Integration

Mechanics, electrical engineering, robotics, grippers, software, and peripherals.

03

Commissioning & Ramp-Up

Tests, optimization, acceptance, documentation, and production support.

Digitale Prüfung von Roboterbahnen und Anlagenablauf

[ ENGINEERING ]

Feasibility is made visible before construction begins

Reach, accessibility, collision spaces, and motion sequences can already be reviewed in the concept and simulation. This means technical risks are identified early.

Simulation does not replace testing on the real component, but it provides a reliable basis for design, takt evaluation, and interface planning.

Techniker prüfen Robotik, Schaltschrank und Anlagenfunktionen bei einer Modernisierung

[ COMMISSIONING ]

Individual components come together into a reliable overall system

During commissioning, mechanics, electrical engineering, robot programming, PLC, sensing technology, and safety come together completely for the first time.

Functions are checked step by step, root causes of errors are separated, and processes are optimized using real components.

Kundenspezifische Roboterzelle bei einer technischen Funktionsprüfung

[ ACCEPTANCE & PRODUCTION RAMP-UP ]

Results become verifiable instead of just visible

Acceptance requires defined criteria. Functions, safety sequences, cycle time (takt), quality, and fault-case behavior are tested against agreed points.

After formal acceptance, if desired, AROBIS supports the production ramp-up and addresses remaining optimization points under real-world conditions.

[ PROJECT PHASES 01–04 ]

From the task to the approved engineering

The first phases create the technical foundation for reliable implementation.

01

Process capture

Collect part, process, variants, cycle time (takt), and environment together.

02

Feasibility

Evaluate robotics, grippers, feeding, safety, and interfaces.

03

Concept

Layout, Funktionsablauf und Verantwortungsgrenzen festlegen.

04

Engineering

Konstruktion, Elektroplanung, Software und Prüfkriterien ausarbeiten.

[ PROJEKTPHASEN 05–08 ]

Vom Aufbau zum stabilen Produktionsbetrieb

Die zweite Hälfte überführt Planung in eine getestete, dokumentierte Produktionslösung.

01

Aufbau

Mechanik, Elektrik, Robotik und Peripherie montieren und prüfen.

02

Inbetriebnahme

Funktionen, Sicherheit und Zusammenspiel schrittweise testen.

03

Abnahme

Vereinbarte Kriterien prüfen und Ergebnisse nachvollziehbar festhalten.

04

Produktionsanlauf

Abläufe unter realen Bedingungen stabilisieren und übergeben.

[ TECHNISCHE BASIS ]

Definierte Annahmen

Offene Punkte und Prozessannahmen werden sichtbar gemacht, bevor sie später zu teuren Änderungen werden.

[ NACHVOLLZIEHBARE ÜBERGABE ]

Prüfbare Ergebnisse

Abnahme, Dokumentation und Einweisung orientieren sich an der tatsächlichen Anlage.

[ PROJEKT STARTEN ]

Besprechen wir Ihre Automatisierungsaufgabe

Senden Sie Prozessbeschreibung, Bauteildaten oder erste Bilder. AROBIS ordnet Machbarkeit, Risiken und nächste Schritte ein.

[ FAQ ]

Häufige Fragen zu AROBIS-Projekten

Antworten zu Ablauf, Datenbedarf, Zuständigkeiten, Abnahme und Produktionsanlauf.

Benötigt werden mindestens Prozessbeschreibung, Bauteile oder Zeichnungen, Varianten, gewünschte Taktzeit, Qualitätsanforderungen und bekannte Schnittstellen.

Ja. Je nach Aufgabe erfolgt die Vorprüfung anhand von Daten, Bauteilen, Versuchen, Simulation oder einem Termin vor Ort.

Die Verantwortungsgrenzen werden projektbezogen festgelegt. AROBIS kann die beteiligten technischen Gewerke gemeinsam koordinieren.

Änderungen werden technisch bewertet, hinsichtlich Auswirkungen auf Termin und Aufwand eingeordnet und vor Umsetzung abgestimmt.

Die Abnahme erfolgt anhand zuvor abgestimmter Kriterien zu Funktion, Sicherheit, Takt, Qualität und Dokumentation.

Ja. Umfang und Zeitraum der Begleitung werden passend zu Anlage, Prozessrisiko und Produktionsplanung vereinbart.